Public comments to LADOT close December 15, 2026
Sunset Blvd & Cesar Chavez Ave · Douglas St → Alameda St

They want to cut Sunset in half.

LADOT plans to take Sunset/Cesar Chavez from two traffic lanes in each direction to one, and remove about 72% of the street parking, between Echo Park and Union Station. Construction starts in 2027, right before the Olympics come to Dodger Stadium. Your comment takes one minute.

Same street. Half the lanes.

This is LADOT's own drawing of Sunset today and what it would become. The street already has bike lanes on both sides.

Today4 traffic lanes · bike lanes both sides · parking both sides
Parking
Bike
Car
Car
Turn
Car
Car
Bike
Parking
LADOT's plan2 traffic lanes · 24-hour bus lanes · north-side parking gone
Bike
Bus only
Car
Turn
Car
Bus only
Parking
Bike
General traffic Bus only, 24 hours Bike Parking Center turn lane

Source: LADOT, Conceptual Renderings and Proposed Cross Section, and the Post-Open House Q&A.

2 → 1
General traffic lanes in each direction
~205
Parking spaces removed, about 72% of the corridor's parking
~1%
Angelenos who commute by bike, per LADOT's own Q&A
0
Game-day delay numbers LADOT has published

Why this plan doesn't work

Every point below comes from LADOT's own project documents.

01

The trade-off is backwards.

Thousands of drivers use Sunset every day. The plan takes half their lanes to upgrade bike lanes that are already there, on a street where LADOT says about 1% of Angelenos commute by bike.

02

Game days get worse, and LADOT knows it.

LADOT's 1–3 minute delay estimate is for a typical weekday only. The game-day plan will be worked out after construction.

"Additional delay is expected during Dodger Stadium events."LADOT open house slides, Aug 2026
03

Traffic moves onto your street.

Drivers won't sit in one lane. They'll cut through the residential streets in Echo Park, Chinatown, and around Elysian Park. LADOT's answer is to watch what happens after it's built.

"LADOT will monitor area conditions after the project is implemented."LADOT Q&A, Oct 2026
04

72% of the parking disappears.

About 205 spaces go, including the north side of the street. Business owners told LADOT that customer parking is their top concern and that most customers drive. No replacement parking has been committed, and garages are off the table.

05

LADOT's model project isn't a success story.

After the same kind of lane cut on Hollywood Blvd, severe-injury crashes went up, from 5 in 2023 to 7 in 2025. LADOT is already reworking that design. Now it wants to do the same thing to a street that carries Dodger and Olympic traffic.

Send your comment

Fill in your details. The letter updates as you type. Then hit the button and your email app opens with everything filled in. You just press send.

Comments with a local ZIP carry more weight.
How do you use Sunset? (pick any)
To
ladot.active@lacity.org
Cc
Councilmember.Hernandez@lacity.org (CD1)
councilmember.jurado@lacity.org (CD14)
Subject
2

Make it count twice. After you send the email, paste the same letter into LADOT's official comment form so it lands in the project record: ladot.typeform.com/sunset-chavez. Use Copy letter above to grab it.

3

Send this page to a neighbor.

Sources

All from LADOT's official project page, ladotlivablestreets.org/projects/sunset.

  1. Fall 2026 Sunset East Fact Sheet: ~205 spaces removed (~72%), lane reduction, up to 1 min 40 sec added per mile at rush hour.
  2. Sunset East Post-Open House Q&A: ~1% bike commute share, game-day plans, after-the-fact monitoring, no new parking garages, Hollywood Blvd crash results.
  3. Aug 26, 2026 Virtual Open House Slides: "additional delay is expected during Dodger Stadium events," business survey results.
  4. Conceptual Renderings and Proposed Cross Section: existing 5-foot bike lanes on both sides.